Together with our valued customer EQUANS, we have ensured an uninterrupted cooling supply at Lugano's municipal hospital, the Ospedale Regionale di Lugano, Civico. Our exclusive LINESTOP Bypass Service was used to ensure a continuous supply of cold water to the machines in the hospital.
The extensive work assignment took place in the hospital's plant room and lasted a total of seven working days. Five of these were at night and two during the day. Our LINESTOP Bypass Service was needed because existing ball valves were no longer functional and had to be replaced. Maximum precision and accuracy were required during the operation, as there was no alternative on site to ensure the hospital's continuous cooling supply.